Trench & Excavation Safety Practice Test

Test what you know about soil types, protective systems, trench boxes, utilities, atmospheres and inspections, with an explanation for every answer.

  • 20 random questions per attempt
  • 96-question bank
  • Instant scoring
  • Nothing is saved

This practice test pulls questions from all 12 free lessons. It is a study aid, not an exam for a certificate, and your answers are never stored.

Knowledge check

Trench safety practice test: 20 random questions

Each attempt draws 20 questions from the 96-question bank built from our free lessons. Score 80% or higher to pass. Select New random test for a fresh set. Nothing you answer is saved or sent.

Question 1 How does OSHA define an excavation?
Question 2 Which description best matches OSHA's definition of a trench?
Question 3 Forms are built inside a 30-foot-wide excavation, leaving 4 feet between the forms and the excavation wall. How should that 4-foot space be treated?
Question 4 Which section of Subpart P sets out when protective systems are required and how they may be designed?
Question 5 Roughly how much can one cubic yard of soil weigh?
Question 6 Which appendix to Subpart P explains how to classify soil?
Question 7 Why can a partial burial, with the worker's head still above the soil, be fatal?
Question 8 A trench wall slab tips into the trench after cracks open parallel to the edge. What type of failure is this?
Question 9 Which of the following is an excavation hazard?
Question 10 At what depth does OSHA generally require a protective system against cave-ins?
Question 11 How far from the edge must spoil and materials be kept, if no retaining device is used?
Question 12 A loaded bucket swings over the trench. What does OSHA require?
Question 13 When must the atmosphere in an excavation be tested?
Question 14 An excavator operator cannot see the edge of the trench while backing up. What is required?
Question 15 Workers exposed to public vehicular traffic must wear what?
Question 16 You notice a crack opening in the ground parallel to the trench edge. What should you do?
Question 17 Which list puts OSHA's categories in order from most stable to least stable?
Question 18 What is the minimum unconfined compressive strength for Type A soil?
Question 19 A clay trench next to a busy highway has a UCS of 2.0 tsf. Why can't it be Type A?
Question 20 Water is freely seeping from the trench wall. How must the soil be classified?
Question 21 How is a layered soil system classified?
Question 22 Backfill around an existing sewer line has been dug before. What is the best possible classification?
Question 23 Which is the maximum allowable slope for Type C soil in an excavation under 20 feet deep?
Question 24 How many analyses does Appendix A require before a competent person classifies soil?
Question 25 What is the minimum number of tests Appendix A requires to classify soil?
Question 26 In the plasticity test, what result indicates cohesive soil?
Question 27 A fresh clump can be indented by the thumb but penetrated only with very great effort. What does this suggest?
Question 28 A sample can be easily penetrated several inches by the thumb and molded with light finger pressure. What does this suggest?
Question 29 What does a pocket penetrometer estimate?
Question 30 During the drying test, a sample cracks as it dries. What does that indicate?
Question 31 Why should manual tests be performed on fresh samples as soon as practical?
Question 32 Which observation is part of a visual analysis?
Question 33 What is the maximum allowable slope for Type B soil in an excavation 20 feet deep or less?
Question 34 A Type C trench is 8 feet deep with a 3-foot-wide bottom. What is the minimum top width if it is sloped at the maximum allowable slope?
Question 35 Who must design sloping or benching for an excavation deeper than 20 feet?
Question 36 Under what conditions does Appendix B allow a ½:1 slope?
Question 37 In which soil type is benching never allowed?
Question 38 A Type B slope at 1:1 begins to show cracks and sloughing. What must happen?
Question 39 If an employer has not classified the soil, what is the steepest slope allowed under 1926.652(b)(1)?
Question 40 A trench with a shielded vertical lower portion in Type C soil is sloped above the shield. How far must the shield extend above the top of the vertical side?
Question 41 What is the main difference between shoring and a trench shield?
Question 42 Which component runs horizontally across the trench and pushes the two walls apart?
Question 43 Why is aluminum hydraulic shoring often preferred for utility trenches?
Question 44 Which appendix to Subpart P contains tables for timber shoring?
Question 45 A crew wants to use a manufacturer's hydraulic shores in a way the tabulated data does not cover. What is required?
Question 46 In what order must support systems be removed?
Question 47 How far below the bottom of a support system may a trench be excavated?
Question 48 Where must manufacturer's tabulated data be kept while the shoring is in use?
Question 49 What does a trench shield (trench box) do?
Question 50 When are workers prohibited from being inside a shield?
Question 51 Under what conditions may a trench be dug up to 2 feet below the bottom of a shield?
Question 52 A shielded lower portion is combined with a sloped upper portion. How high must the shield extend above the top of the vertical side?
Question 53 Where should the ladder be placed when a crew works inside a trench box?
Question 54 A crew wants to weld a bracket onto a trench box side wall. What is required?
Question 55 Which area is not protected by a standard two-sided trench box?
Question 56 Why should the gap between a trench box and the trench wall be kept small?
Question 57 At what trench depth does OSHA require a means of egress such as a ladder?
Question 58 What is the maximum lateral travel distance to the nearest means of egress in a trench 4 feet or deeper?
Question 59 How far must ladder side rails extend above the top of the trench, if no grab rail is used?
Question 60 What is the minimum distance spoil must be kept from the edge of an excavation if no retaining device is used?
Question 61 Who must design a structural ramp used only by employees for access to an excavation?
Question 62 When do walkways over excavations require guardrails?
Question 63 Why does a large spoil pile right next to a trench increase cave-in risk even if it doesn't roll in?
Question 64 A crew needs to dig below the footing of an adjacent building. Which condition would allow it under 1926.651(i)?
Question 65 When must the estimated location of underground utilities be determined?
Question 66 What color marks indicate a gas line?
Question 67 What do red marks indicate?
Question 68 What should you use to expose a line inside the tolerance zone?
Question 69 Which lines are commonly NOT marked by the 811 process?
Question 70 If a utility owner cannot respond within 24 hours, what does OSHA allow?
Question 71 Your bucket scrapes the coating on a steel gas line but nothing leaks. What should you do?
Question 72 What does OSHA require for underground installations exposed while the excavation is open?
Question 73 Before entering an excavation of what depth must the air be tested where a hazardous atmosphere could reasonably be expected?
Question 74 Below what oxygen level does OSHA consider an atmosphere oxygen-deficient?
Question 75 What flammable gas limit does 1926.651(g) set for excavations?
Question 76 A gas-powered trash pump runs at the edge of a deep, narrow trench. Which gas is the main concern?
Question 77 Where hazardous atmospheres may develop, what must be true of emergency rescue equipment?
Question 78 Who must monitor water removal equipment used to control water in an excavation?
Question 79 Water is freely seeping from a trench wall that was classified as Type B. What happens to the classification?
Question 80 When must a competent person inspect an excavation in relation to rain?
Question 81 What two things make someone a competent person under OSHA's definition?
Question 82 When must the competent person inspect an excavation?
Question 83 What must the competent person do on finding evidence of a possible cave-in?
Question 84 Who decides whether a trench less than 5 feet deep needs a protective system?
Question 85 Who designates the competent person on a jobsite?
Question 86 Which of these is a warning sign of a potential cave-in?
Question 87 Which task does Subpart P assign to the competent person?
Question 88 Daily inspections under 1926.651(k) are required when:
Question 89 A co-worker is partially buried in an unprotected trench. What should you do first?
Question 90 Why are untrained rescuers at high risk after a cave-in?
Question 91 Why should you stop excavators and other equipment near a collapsed trench?
Question 92 How do professional trench rescue teams typically recover a buried worker?
Question 93 Within what time must an employer report a work-related fatality to OSHA?
Question 94 Within what time must an employer report an in-patient hospitalization, amputation or loss of an eye?
Question 95 Where hazardous atmospheres could develop in an excavation, which equipment must be readily available?
Question 96 A trench wall sloughs off while nobody is inside. What is the right response?

Last reviewed: October 25, 2026 · Free general education based on OSHA 29 CFR 1926 Subpart P. It does not replace the site-specific training and competent person your employer must provide, and it does not issue a certificate. Nothing you enter on this page is saved or sent.

Need Documented Excavation Training?

Self-paced online courses aligned with OSHA Subpart P. Certificate of completion. English & Spanish.